City Development of Burhanpur Essay

The city has a large concentrations of power looms (nearly 38,000). Power shortage, unrecognized settlement is major problem to them. Banana: Nearly 48 lack quintal of banana is traded in the maid annually. Due to its position on Maharajah’s border, faces stiff competition from Libra trade policies of Maharajah’s. MONUMENTS OF BURBANK The key considerations under CDC Handloom: Traditional skills in handloom like Kari, Gizzard, Burping Scare; and handicrafts are perishing by migration.

Slums and Urban poor: The city has 33,645 PL card holders, implies that nearly 1. 7 lack people in the city live below poverty line. Environment: Increasing deforestation in Saturn has had severe implications on city, dentures of reduction of ground water levels, localized flooding, high dust level, erosion level. The “city of gardens” of the McHugh era does not have any garden in the present day context. The proposed master plan of the city proposes only 4% of the city area to be developed as green, as against the standard of 18 to 20%.

We Will Write a Custom Essay Specifically
For You For Only $13.90/page!


order now

The road map of Burbank focuses on community based approach, capacity building of LB, involvement of the citizens in the heritage listing process and creating a success story in Burbank which can be portrayed internationally. It is proposed that : – Paved pathway connecting all the Ghats from Gnashing to Satyr chat should be built and provided with rich greenery and landscaping. – A ropey to connect rajah to Gymkhana is also proposed. – Development of OAT at Gymkhana also portray this zone as heritage UCM recreational. Kabuki Sara as place for organizing cultural shows. – Sharing and Mall Guar as Retreats Development of integrated power loom cluster. A handloom cluster for revival of Kari, Burping and other looms has been proposed. Banana cluster; A plant based on waste to wealth creation from banana stems is proposed. Plant could be for manufacturing of hard board and softbound or for the experienced fabric from ban fiber. Small scale industries and vocational trainings for slum dwellers, especially women have been proposed.

Tong’s are proposed to be redesigned and revived as sustainable transportation which would be confined to heritage routes, riverfront and PIT routes. Provision of Pedestrian walkways, green buffer and cycle tracks along all main city roads is also proposed. Institutional areas in walled city are proposed to be shifted out. Land under Nehru Hospital is proposed to be developed as an Intermediate health facility and garden area. Multistoried parking is proposed on Thesis site. Other parking areas can be developed on Old bus stand site (after shifting of bus stand outside the city).

Citrus route has been proposed for the inner city and outer city to provide enhanced connectivity between walled city and outer city. Through truck traffic to the city needs to be stopped by providing a peripheral ring road; which will also provide connectivity to Kind Bandanna. The area under proposed Master Plan greens needs to e increased from 4% to 20%. Projects for catchments conservation and floodplain plantation of Adapt, Italic and Pandora have been proposed.

Development of solar what where solar equipment can be given to poor on rent; solar and wind based power plants and an energy efficiency programmed on SEES funding is proposed. This project would target energy efficiency in street lighting, pumps used by NP and pumps used in agricultural areas of the district (based on Gujarat model). Social and physical Infrastructure The water supply to the city is entirely dependent on ground water. The per capita apply is much below the standards; 65 Pick. Despite the presence of Adapt, no attempts at utilizing surface water have yet been made.

The walled city has local wells and tanks which are in state of disrepair and need immediate attention. Monsoon retention capacity of Burbank catchments is presently very low (0. 5% approximately) and needs to be increased to 20% by constructing ponds and recharge wells. The city doesn’t have a sewerage system. Open drains carry the waste water to Pandora, which empties into Adapt untreated. The city has no SUM system and waste is openly disposed. The present solid waste generation of the city is estimated as 73. 74 MAT with 45. 7% uncollected waste.

The walled city has a drainage network which needs to be revived. Saturn forestation needs to be undertaken to reduce localized flooding in the city. There is a lack of ring road. High congestion level in walled city, high encroachment level, lack of parking spaces. The city lacks adequate facilities for treatment of TAB, respiratory diseases and AIDS which are prevalent in the city. The city also needs to be provided with vacillation and agro based institutes. The traditional Hyannis Arrived medicines systems needs to be promoted.

INFRASTRUCTURE For water supply, an immediate shift to surface water sources by water augmentation and supply from Based dam is proposed. Along with a water supply scheme, a large recharge scheme is also needed for the city, To increase the water retention from 1% to 20% through construction of ponds, recharge wells, and rooftop harvesting. In terms of sewerage, the existing STEP needs to be made functional and an intercepting sewer along the length of Adapt (underneath the proposed pathway linking the Ghats) needs to be developed.

Since the percentage of bio degradable waste is high, the private party can also set up a compost plant and the compost can be sold in the neighboring agricultural areas. Revival to old city drainage network and deterioration to Strauss tort reducing flooding in the city are proposed. It is proposed that 2 ponds be developed in the city; one to divert monsoon flow from Italic and the other to divert flow from Pandora. Since the runoff from Strauss will have a high silt content, it is proposed that these ponds be provided with recharge bores for enhanced percolation.